Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014-7-29 18:16:55 Read: 3490 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
高清免费播放一曲二曲三曲 | 国产精品久久久久久久天堂第1集 | 亞洲精品視頻啊美女在綫直播 | 性一交一乱一色一视频麻豆 | 潘金莲一级婬片AAAAAA播放 | 亚洲一级无码AV毛片久久 | 国产精品免费人成网站酒店 | 国产日韩精品无码区免费专区国产 | 国产精品激情偷乱一区二区∴ | 国产午夜视频在线观看 | 韩国成人精品a∨在线观看 337p日本大胆噜噜噜噜 | 无码任你躁久久久久久老妇91 | 黑人精品欧美一区二区蜜桃 | 精品少妇人妻一区二区黑料社区 | 五月丁香六月综合缴情啪啪 | 国产一级内射麻豆91 | EEUSS鲁丝片无码一级 | 日本人妻中文字幕爽爽爽干人妻 | 精品人妻一区二区三区浪潮在线 | 中美日韩一区二区三区四区五区六区视频 | 日本中文字幕在线不卡 | 久久久久亚洲AV成人片一级毛片 | 国产传媒在线免费观看 | 成人免费无码婬片在线 | 大黑人性XX交亚洲欧美二区 | 97人妻视频一区二区三区 | 少妇与大狼拘作爱视频 | 久久强奷乱码老熟女网站苍井空 | 少妇高潮婬片A片免费 | 黃色A片老师三級三級三級H野外 | 国产乱码精品一品二品 | 人人添人人澡人人澡人人人人孕妇 | 中日韩精品A片中文字幕 | 亚洲熟妇自拍偷拍另欧美一百度一百度 | av无码国产在线观看 | 国产爆乳美女呻吟娇喘网站 | 国产农村A片国语对白 | 五十路熟妇无码AV在线 | 国产无码精品在线播放 | 国产精品久久码一区二区暖暖免费 | 波多野结衣乳巨码无线观看 |