Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014-7-29 18:16:55 Read: 3488 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
久久天天东北熟女毛茸茸 | 免费观看黄视频网站入口 | 日韩精品无码一区二区三区 | 欧美性夜黄A片爽爽免费视频 | 午夜精品视频久久久男女 | 精品少妇无码AV无码专区免费 | Xx肥妇扒开粉嫩久久久久久 | 色屁屁XXXXⅩ在线视频 | 国产91 精彩刺激69 | 交换人妻一区二区三区 | 日韩精品一区二区三区四区 | 亚洲家庭伦理在线线观看 | 丝袜秘书一区二区三区四区 | 久久久91人妻无码精品蜜桃 | 中文子幕妇女伦伦在线 | 无码久久久久久人妻a又粗又大 | 四虎8848精品成人免费网站 | 国产精品国产一级A片精品乌克兰 | 丰满人妻熟女AⅤ一区 | 蜜臀色欲AV无码人妻 | 91精品人妻一区二区 | 操逼视频在哪看? | 亚洲精品一区无码A片 | 国产午夜视频在线观看 | 真实的国产乱XXXX在线 | 国产农村妇女毛片精品久久久久 | 一本岛在免费一二三区 | 刮BBB揉BBBB揉BBBB | 人人操人人操人人操人人操 | 精品无码人妻一区二区三区色 | 熟伦熟女新五十伦熟妇水密桃 | 欧美国产一区二区亚瑟 | 黄红桃成人A片免费观看 | 日韩欧美国产一二三区无码黑寡妇 | 亚洲AV无码乱码在线观看一区 | 亚洲精品污一区二区三区 | 无码国产精品一区二区色情八戒 | 强行糟蹋人妻hd中文字幕 | 国产精品电影久久久久久 | 91亚洲狠狠色综合久久久久久久 | ..真实国产乱子伦对白在线_欧 |