Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014-7-29 18:16:55 Read: 3486 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
国产无码高清在线播放 | 欧美三级在线观看中文妖精视频 | 国产亲子伦A片免费看 | 粉嫩AⅤ一区二区三区四区五区 | 人人爽人人澡人人妻蜜臀么 | 西西裸体午夜无码一级毛片不卡 | 精品少妇无码AV无码专区免费 | 中文字幕久久熟女蜜桃 | 国产成人婬片A片免费老师 美女极度色诱www爽爽爽 | 精品人妻久久久久一区二区三区 | 先锋影音av亚洲一区二区 | 久久婷婷五月综合色国产香蕉 | 国产片婬乱一级A片金苹果 欧美性受XXXX白人性爽 | 黑寡妇精品欧美一区二区在线观看 | 欧美婬片内谢A片AAABBB | 日韩成人AV在线观看 | 最污的黄网站无遮挡国产 | 特级西西人体大胆无码 | 99久久久无码国产精品性青椒 | 日本无码一区二区精品影片潘金莲 | 老妇人高潮一区二区电影 | 国产毛片精品一区二区色欲黄A片 | 国产精品久久久久久久久久久免费看 | 麻豆精品秘 国产传媒视频 搡BBB搡BBB免费观看 | 国产精品探花一区二区在线观看 | 寡妇高潮一级爽毛片在线 | 少妇人妻av又粗又大上海 | 饥渴寡妇偷乱公A片 | 成人H动漫精品一区二区无码软件 | 久久久久久一区密桃 | 日本猛少妇BBB欧美一级毛片 | 真实对白乱子伦对白37p | 7777色情肉黄我A片免费看蜜臀 | 偷拍大白天夫妻性对白 | 91偷拍一区二区三区精品 | 国产肥婆乱婬视频一区 | 国产白丝袜美女久久久久 | 99国产精品久久久精品三级 | 免费在线观看91成人 | 在线观看污视频网站 | 国产精品99久久久精品无码 |