The ball mill installation test run

Date: 2014-7-29 18:16:55 Read: 3486 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
无套中出丰满人妻无码电影院 | 四川少BBB搡BBB爽爽爽 | 亚洲第一区二区在线 | 免费无码婬片qqqq | 欧美一级婬片A片无码出租房 | 91色屁屁TS人妖系列二区 | 国产无码在线高清视频 | 免费无码婬片A片AAA毛扒开 | 柚子TV成人免费视频网站 | 日本无码A片免费网站 | 红桃视频一区二区三区免费观看 | 女人被狂躁C到高潮视频 | 西西4444WWW无码精品 | 国产精品小电影在线观看网址 | 国产精品美女www爽爽爽 | 国产成人av一区二区 | 免费在线观看91成人 | 一级a一级a爰片免费啪啪女女 | 国产做受 高潮91网站一 | 欧美级婬片A片久久精品水中花毛 | 国产精品久久久久久久久久免费 | 国产精品女人A片爽爽视频 jk白丝护士一区二区三区 | 欧美人与性动交A级毛片 | 国产在线精品一区二区不卡了阿恩 | 一级黄色A片免费观看 | 人人妻人人爽毛片DVD | 国产精品WWW久久久久久 | 91精品国产色综合久久不卡蜜臀 | 国产精品.XX视频.XXTV | A级高清视频欧美日韩 | 樱花视频A片成人免费播放 欧美性猛交XXXX黑人交 | 亚洲无码软件导航影音先锋 | 丁香婷婷一区二区三区 | 中文字幕丰满子伦无码 | 影音先锋女人aV鲁色资源网站 | 久久偷看各类wc女厕嘘嘘偷窃 | 精品无码一级毛片免费视频观看 | 欧美97久久人人模人人爽人人喊 | 亚洲第一区二区在线 | 天天躁日日躁狠狠躁av麻豆男男 | ,亚洲人成毛片在线播放 |